We plan, install and certify the network cabling for new offices, from the first drop count on your floor plan to tested, labeled ports on move-in day, timed around your general contractor’s schedule.

Moving into a new office? Our C-7 licensed crews handle new office cabling in San Francisco CA for workstations, conference rooms, Wi-Fi access points, cameras and the telecom room. The key is timing: cable has to go in after framing but before ceilings and walls close, so we join the project early and work to your construction calendar.

Signed a lease or starting a buildout? Get your cabling planned before construction starts. Call (628) 215-7235.

Request a quote

What’s Included in Your New Office Network Infrastructure

A new office needs more than desk drops. Here’s everything we wire so your team can plug in, connect and work from the first day.

  • Drop planning and device layout

    We mark every data, voice, Wi-Fi, camera and AV location on your floor plan, then confirm counts with your IT lead and architect before a single cable is ordered.

    • Floor Plan Markup
    • Drop Counts
    • Device Schedule
    • IT Sign-Off
  • Workstation and furniture drops

    Cat6 or Cat6A to every desk, routed through walls, power poles or modular furniture raceways and terminated at faceplates that line up with the furniture plan.

    • Workstations
    • Furniture Raceways
    • Power Poles
    • Faceplates
  • Conference rooms and AV prewire

    Floor boxes, table connectivity, display and camera drops, and HDBaseT runs roughed in so the AV integrator can finish the room without opening walls.

    • Floor Boxes
    • Display Drops
    • HDBaseT
    • Video Conferencing
  • Wireless access point drops

    Ceiling drops placed from a predictive Wi-Fi survey, typically two Cat6A runs per access point for multi-gig uplinks and PoE++ power.

    • Wi-Fi Survey
    • Cat6A AP Drops
    • PoE++
    • Ceiling Mounts
  • Telecom room and network rack build

    Racks, ladder rack, patch panels, grounding and seismic bracing in the new IDF or server room, ready for your switches on day one.

    • Racks
    • Patch Panels
    • Grounding
    • Seismic Bracing
  • Security and carrier prewire

    Cabling for cameras, card readers and door hardware, plus a demarc extension from the building’s point of entry so your ISP can light circuits on time.

    • Camera Prewire
    • Access Control
    • Demarc Extension
    • ISP Coordination

New Office Drop Planning Guide

Most cabling problems in a new office trace back to the drop count. Too few drops means surface raceway and extension cables six months later; too many means paying for ports nobody uses. These are the typical counts we start from, then adjust to your furniture plan, headcount and growth.

Typical drop counts and cable types for each space in a new office
Space or deviceTypical dropsCableNotes
Open-plan workstation2Cat6One data, one spare or phone; Cat6A if desks need multi-gig
Private office2 to 4Cat6Add a drop for a wall display or desk phone
Conference room4 to 8Cat6AFloor box, display, camera and room controller
Wireless access point2 per APCat6AAbout one AP per 1,500 to 2,500 sq ft, set by survey
Reception and lobby3 to 4Cat6Front desk, phone, visitor kiosk, display
Security camera1Cat6 or Cat6APoE; Cat6A for PTZ or multi-sensor cameras
Printer or copier1 to 2Cat6Second drop for a badge-release terminal
Server room or IDF uplinkAs designedFiber + Cat6ABackbone fiber to the MDF and copper to the demarc

We also plan for growth: spare ports on every patch panel, empty capacity in pathways, and at least 20 percent extra rack space, so adding a team later doesn’t mean reopening ceilings.

3D office floor plan showing workstations, conference rooms and open-plan layout for drop planning
Drop plan for a 12,000 sq ft office: 186 Cat6 data drops, 14 dual Cat6A access point locations and 6 conference rooms with floor boxes, all within 90 m of a single IDF.

New Office Low Voltage Timeline

Cabling runs alongside construction, not after it. Here’s how a typical new office project lines up with your buildout.

  1. Design (8 to 12 weeks before move-in)

    We review architectural drawings, mark up drops, size the telecom room and confirm pathways with your architect and GC.

  2. Order internet circuits (60 to 90 days out)

    Carriers often need two to three months to deliver fiber service, so we help you order early and plan the demarc extension.

  3. Rough-in (after framing, before ceilings close)

    We install J-hooks, sleeves and backboxes, pull cable to every location and build out the telecom room.

  4. Trim-out (after paint and furniture)

    Faceplates, jacks and patch panels are terminated, and access points and cameras are mounted.

  5. Certify and cut over (move-in week)

    Every link is tested and labeled, switches are patched, and we stay on call for move-in day.

New Offices We Wire Around the City

Mission Rock new construction

First-generation office floors near Oracle Park, where tenants start with an empty shell and every drop, AP and telecom room is designed from scratch.

SoMa startup headquarters

Open-plan offices in converted warehouses, with exposed ceilings that call for clean cable tray runs and ceiling-mounted Wi-Fi 7 access points.

Presidio office conversions

Historic buildings converted to offices, where cabling routes must respect preserved walls and ceilings and work closely with the property’s design rules.

Jackson Square professional firms

Law, design and architecture firms moving into brick-and-timber buildings, with quiet, low-profile cabling and dedicated conference room AV.

What to Have Ready Before We Start

You don’t need everything on day one, but these items keep a new office project on schedule.

  • Architectural floor plan
  • Furniture layout
  • Headcount and growth plan
  • Move-in date
  • GC contact and schedule
  • Internet carrier and order date
  • Wi-Fi, phone and camera plans
  • Conference room AV needs
  • Building rules for after-hours work

Testing & Move-In Handoff

Every copper link is certified to TIA-568.2-D and every fiber strand is loss-tested before move-in. You receive labeled port maps, as-built drawings and PDF test reports, organized by telecom room and patch panel, so your IT team knows exactly what’s connected where from day one.

New office IDF rack with labeled Cat6 patch panels connected to network switches
New office IDF on move-in week: four 48-port Cat6 panels and one 24-port Cat6A panel patched to switches, every port labeled to TIA-606 and certified.

New office projects often pair with these scopes. See our main structured cabling page for the full overview.

New Office Wiring Service Area

We wire new offices in every neighborhood of the city, plus these Peninsula, East Bay and Marin cities:

See every location on our service area page.

Request a New Office Wiring Quote

Send your floor plan, furniture layout or move-in date, and we’ll schedule a site walk and return an itemized quote, usually within two business days.

San Francisco Telecom Techs
One Beach St, San Francisco, CA 94133
Phone: (628) 215-7235
Email: [email protected]

Get your new office wired, tested and ready before move-in day.

Request a quote

Send us your project details