New Office Cabling in San Francisco CA
We plan, install and certify the network cabling for new offices, from the first drop count on your floor plan to tested, labeled ports on move-in day, timed around your general contractor’s schedule.
Moving into a new office? Our C-7 licensed crews handle new office cabling in San Francisco CA for workstations, conference rooms, Wi-Fi access points, cameras and the telecom room. The key is timing: cable has to go in after framing but before ceilings and walls close, so we join the project early and work to your construction calendar.
Signed a lease or starting a buildout? Get your cabling planned before construction starts. Call (628) 215-7235.
Request a quoteWhat’s Included in Your New Office Network Infrastructure
A new office needs more than desk drops. Here’s everything we wire so your team can plug in, connect and work from the first day.
-
Drop planning and device layout
We mark every data, voice, Wi-Fi, camera and AV location on your floor plan, then confirm counts with your IT lead and architect before a single cable is ordered.
-
Workstation and furniture drops
Cat6 or Cat6A to every desk, routed through walls, power poles or modular furniture raceways and terminated at faceplates that line up with the furniture plan.
-
Conference rooms and AV prewire
Floor boxes, table connectivity, display and camera drops, and HDBaseT runs roughed in so the AV integrator can finish the room without opening walls.
-
Wireless access point drops
Ceiling drops placed from a predictive Wi-Fi survey, typically two Cat6A runs per access point for multi-gig uplinks and PoE++ power.
-
Telecom room and network rack build
Racks, ladder rack, patch panels, grounding and seismic bracing in the new IDF or server room, ready for your switches on day one.
-
Security and carrier prewire
Cabling for cameras, card readers and door hardware, plus a demarc extension from the building’s point of entry so your ISP can light circuits on time.
New Office Drop Planning Guide
Most cabling problems in a new office trace back to the drop count. Too few drops means surface raceway and extension cables six months later; too many means paying for ports nobody uses. These are the typical counts we start from, then adjust to your furniture plan, headcount and growth.
| Space or device | Typical drops | Cable | Notes |
|---|---|---|---|
| Open-plan workstation | 2 | Cat6 | One data, one spare or phone; Cat6A if desks need multi-gig |
| Private office | 2 to 4 | Cat6 | Add a drop for a wall display or desk phone |
| Conference room | 4 to 8 | Cat6A | Floor box, display, camera and room controller |
| Wireless access point | 2 per AP | Cat6A | About one AP per 1,500 to 2,500 sq ft, set by survey |
| Reception and lobby | 3 to 4 | Cat6 | Front desk, phone, visitor kiosk, display |
| Security camera | 1 | Cat6 or Cat6A | PoE; Cat6A for PTZ or multi-sensor cameras |
| Printer or copier | 1 to 2 | Cat6 | Second drop for a badge-release terminal |
| Server room or IDF uplink | As designed | Fiber + Cat6A | Backbone fiber to the MDF and copper to the demarc |
We also plan for growth: spare ports on every patch panel, empty capacity in pathways, and at least 20 percent extra rack space, so adding a team later doesn’t mean reopening ceilings.
New Office Low Voltage Timeline
Cabling runs alongside construction, not after it. Here’s how a typical new office project lines up with your buildout.
Design (8 to 12 weeks before move-in)
We review architectural drawings, mark up drops, size the telecom room and confirm pathways with your architect and GC.
Order internet circuits (60 to 90 days out)
Carriers often need two to three months to deliver fiber service, so we help you order early and plan the demarc extension.
Rough-in (after framing, before ceilings close)
We install J-hooks, sleeves and backboxes, pull cable to every location and build out the telecom room.
Trim-out (after paint and furniture)
Faceplates, jacks and patch panels are terminated, and access points and cameras are mounted.
Certify and cut over (move-in week)
Every link is tested and labeled, switches are patched, and we stay on call for move-in day.
New Offices We Wire Around the City
Mission Rock new construction
First-generation office floors near Oracle Park, where tenants start with an empty shell and every drop, AP and telecom room is designed from scratch.
SoMa startup headquarters
Open-plan offices in converted warehouses, with exposed ceilings that call for clean cable tray runs and ceiling-mounted Wi-Fi 7 access points.
Presidio office conversions
Historic buildings converted to offices, where cabling routes must respect preserved walls and ceilings and work closely with the property’s design rules.
Jackson Square professional firms
Law, design and architecture firms moving into brick-and-timber buildings, with quiet, low-profile cabling and dedicated conference room AV.
What to Have Ready Before We Start
You don’t need everything on day one, but these items keep a new office project on schedule.
- Architectural floor plan
- Furniture layout
- Headcount and growth plan
- Move-in date
- GC contact and schedule
- Internet carrier and order date
- Wi-Fi, phone and camera plans
- Conference room AV needs
- Building rules for after-hours work
Testing & Move-In Handoff
Every copper link is certified to TIA-568.2-D and every fiber strand is loss-tested before move-in. You receive labeled port maps, as-built drawings and PDF test reports, organized by telecom room and patch panel, so your IT team knows exactly what’s connected where from day one.
Related Structured Cabling Solutions
New office projects often pair with these scopes. See our main structured cabling page for the full overview.
- Structured Cabling Installation: Standard TIA-568 horizontal and backbone installs for any floor.
- Commercial Structured Cabling: Building-wide riser, backbone and multi-tenant systems.
- Tenant Improvement Cabling: Rewiring existing space during a TI buildout, with cable abatement.
- Office Relocation Cabling: Moving your network from the old office to the new one over a weekend.
- MDF / IDF Build-Out: Telecom rooms built from bare walls with racks, grounding and bracing.
New Office Wiring Service Area
We wire new offices in every neighborhood of the city, plus these Peninsula, East Bay and Marin cities:
- Daly City, CA
- Tiburon, CA
- Alameda, CA
- Oakland, CA
- South San Francisco, CA
- San Bruno, CA
- Albany, CA
- Berkeley, CA
- Piedmont, CA
- Mill Valley, CA
See every location on our service area page.
Request a New Office Wiring Quote
Send your floor plan, furniture layout or move-in date, and we’ll schedule a site walk and return an itemized quote, usually within two business days.
San Francisco Telecom TechsOne Beach St, San Francisco, CA 94133
Phone: (628) 215-7235
Email: [email protected]
Get your new office wired, tested and ready before move-in day.
Request a quote